Mole Ploughing Mole Ploughing Mole ploughing enables the rapid installation of long legnths of MDPE pipework – 150m of 63mm pipe in as little as 30 minutes! Pipe is laid at exactly the correct depth with minimal surface disruption. Unlike traditional trenching, it preserves soil layers and avoids leaving a visible subsoil trench. Our DitchWitch mole plough The beginning of 90mm pipe installation Close up of the blade end of the mole plough Ploughing down the tramlines of a field Water pipe visible at the end of a plough run There are minimal scar lines compared to trenching Large bore pipe visible in a service trench Field is useable again straightaway after a plough run A small excavation for a pipe joint Joint holes only every 150m Excavations to join lengths of pipe are minimal Plough run along the edge of a field A mole plough run through a gateway on the edge of a field Pipe installed via mole plough into a manhole chamber Pipe installed via mole plough to an irrigation hydrant A mole plough run going round the corner of a field The mole plough going off round the corner Pipe installated via trench followed by mole plough DitchWitch RT80 ride-on trencher (mole plough) We do get to install pipe in lovely places!